TASK is providing environmental management services to support closure of a sugar mill. The plant was inspected and chemicals inventoried. An environmental closure plan and estimated cost were developed for client approval. Waste chemicals were collected, categorized, packaged and disposed of. Fluorescent bulbs and ballasts were removed and disposed of. Obsolete metal parts and piping were collected and recycled. Debris was collected and disposed of. We have closed the above ground tanks and piping to include the Bunker C tank and piping, acid and caustic tanks and piping, and mineral oil tanks. An assessment and remediation of the Bunker C tank area was conducted, and site closure was approved by the FDEP.